TIPS Bi – Weekly Meeting Minutes
May 26, 2005
Tele – conference Call
9:30 to 11:00 AM (GMT 6:00)
Note Taker: Robert Welsh
Participants:
WRCC: Mike
Benavides, Bill Clark, Mary Greene, Bill Kannawin, Diane Osborne, Dan Rivers,
Robert Welsh, Alan Wilhelm
MCRCC: None
ARCC: Mike Dunn, Susan Stoyek,
KFO: Bill Card, Daniel Lewis
Big Stone Gap FO: Harry
Morris
Section: Priority Items
Topic: FTP replacement and OSM
WAN
Discussion: Internosis has run into internal agency security issues, but
is continuing testing and expects to bring the FTP site up in the next week
along with additional security documentation required by HQ.. OSM WAN is now
under MCI control as part of DOI-mandated switch to ESN. Result will ultimately
be greatly increased network bandwidth.
Action: McNish will send e-mail
informing TIPS and its users when the FTP site is operational.
Topic: Training room migration
Discussion: Stoyek has a call in to Matin Nouri, but
not currently a concern. Clark agreed to table this issue until
November.
Section: Status Reports
Topic: OSM USGS Demo
Projects
Discussion: Follow-up on USGS Rolla Remote Sensing
collaboration.
Action: Osborne will contact Emmitt Witt of USGS on
preliminary Remote Sensing test imagery results before any MOU
negotiations.
Topic: Training Program
Discussion: TIPS team approved
changes to the manual preparation lead time for submittal to the TIPS training
coordinator to 4 weeks in advance of classes for black and white materials, and
6 weeks for color materials. Welsh reports interim training survey results of
465 instructor-led slot requests, with many non-responding state/Tribes. PA has
requested multiple slot requests for nine TIPS core software in numbers that
indicate customer-site training for PA may be appropriate. NTTP has added an
additional ITC session for Nov. 13-18, 2005, and TIPS has two attendees with
more likely.
Action: Windle will make the above changes in the TIPS Team
Charter. Welsh will send e-mail to TIPS Service Managers indicating the
non-responding states. TIPS Services Manager will contact those states to
encourage survey completion and submittal. Uranowski will confirm the high
number of PA training requests and investigate possible training venues for FY06
scheduling. TIPS Course Managers will recommend ITC attendees to Welsh, and
supply him with instructor and instructor manager contact info by COB May
27.
Topic: Software Distribution
Discussion: Greene has now received
cd’s for SurvCADD, AutoDESK (AutoCAD and Raster Design).
Action: Greene
will prepare a list of remaining needed materials for the distribution and
provide to Clark.
Topic: TIPS Strategic Plan Meeting – June 1 and 2 in
Denver
Discussion: Strategic Plan Team, Rivers and Clark will meet in
Denver to edit the Strategic Plan and work with the TIPS Exhibit 300 to link to
the Strategic Plan where appropriate.
Action: Greene and Welsh will be
available to provide input. Card will send out Exhibit 300 with Strategic Plan
cites to the TIPS Team after the Strategic Plan and Exhibit 300 are revised.
.
Topic: OSM – State Geospatial Team and EGIM
Discussion: Card
has telecom on 5/27 to discuss increased number of hours for EGIM participation
Action: Card will revise the Geospatial Team documents to include state
participation on the team.
Topic: TIPS Web Team
Discussion: Greene
and Winters are working on content.
Topic: TIPS Management team
changes
Discussion: Clark introduced Dan Rivers to the TIPS Team as IT
Branch Chief in Denver.
New Items:
Topic: DOI Technical Reference Model
(TRM) Software Classification List
Discussion: Greene e-mailed TIPS team the
draft list of TIPS Software that should be included for the TRM list. If
software is not on this list, it will not be possible to procure it. All core
TIPS COTS software should be classified on the list as “preferred”.
Action:
TIPS Team will review the list and add or modify as appropriate, and return to
Greene ASAP.
Topic: Team Member Reports [All]
ARCC –Morris – VA
would like TIPS to provide a new HP Design jet 550 plotter to replace their old
1065 model. TIPS funding limitations will preclude replacement.
ARCC – Card
will follow up on the ESRI Executive Session to see how many invitations OSM
will be offered.
WRCC – Clark reports that OSM is migrating to MS Outlook
Exchange for e-mail between June 13-30. Morlock will work with the DNS database
and Outlook to resolve the current problems with e-mail in the TIPS training
program. Dave Berry from CO Title V will be requesting additional TIPS
assistance in GIS/mobile computing in the near future. It now appears that TIPS
will not be receiving the supplemental $253K requested in the Additional Needs
submittal. Any additional funding for TIPS at end-of-year is to be used for
mobile computing needs previously identified. Benavides will make image
compression for ArcGIS 9.x issue resolution top priority.
WRCC - Osborne
reports a successful Remote Sensing workshop for the OSM Charleston, WV Field
Office, in collaboration with DOE NETL, and identified 25 potential applications
of remote sensing data in FO work.
WRCC – Wilhelm – ArcGIS 9.1 will be
delivered to TIPS next week. TIPS will test and attempt to distribute separately
in August, with split licenses hosted between OSM and VA. Fifteen OSM-sponsored
ESRI conference attendees will attend two 90 minute internal meetings during the
conference.
Next meeting Thursday June 9,
2005